Sponsorship - Bradford Means Business
20 Jul 2023 – 22 Jul 2024
—
i
Details of the Sponsorship - Bradford Means Business project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Jul 2023, and the latest date is 22 Jul 2024.
BD is Lit 2023
3 Nov – 4 Nov 2023
—
i
Details of the BD is Lit 2023 project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 3 Nov 2023, and the latest date is 4 Nov 2023.
Drum Roll Please
16 Jan – 11 Sep 2024
—
i
Details of the Drum Roll Please project.
We are counting 17 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 104
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2024, and the latest date is 11 Sep 2024.
Closing Event (Brighter Still) - Emily Lim/Dan Canham
1 Mar 2024 – 30 Sep 2025
—
i
Details of the Closing Event (Brighter Still) - Emily Lim/Dan Canham project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 34
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 1 Mar 2024, and the latest date is 30 Sep 2025.
TCF Artist Residency
15 Mar – 10 Apr 2024
—
i
Details of the TCF Artist Residency project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 23
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Mar 2024, and the latest date is 10 Apr 2024.
Bradford Glow
16 Apr 2024 – 1 Aug 2025
—
—
i
Details of the Bradford Glow project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 16 Apr 2024, and the latest date is 1 Aug 2025.
Where It Began – Osman Yousefzada
29 Apr 2024 – 30 Nov 2025
i
Details of the Where It Began – Osman Yousefzada project.
We are counting 955 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 65
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 29 Apr 2024, and the latest date is 30 Nov 2025.
The Bradford Progress
30 Apr 2024 – 30 Jun 2025
i
Details of the The Bradford Progress project.
We are counting 115 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,740
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Apr 2024, and the latest date is 30 Jun 2025.
Bradford 2025 Website
1 May 2024 – 1 Nov 2025
—
—
i
Details of the Bradford 2025 Website project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 1 May 2024, and the latest date is 1 Nov 2025.
Where It All Begain
3 May – 13 Oct 2024
—
i
Details of the Where It All Begain project.
We are counting 126 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 3 May 2024, and the latest date is 13 Oct 2024.
Sponsorship - Insider Placemaking
13 May 2024
—
i
Details of the Sponsorship - Insider Placemaking project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 13 May 2024.
Sponsorship - Sports Awards
17 May 2024 – 8 May 2025
—
i
Details of the Sponsorship - Sports Awards project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 17 May 2024, and the latest date is 8 May 2025.
New Focus: Bradford Young Curators
31 May 2024 – 1 Nov 2025
—
i
Details of the New Focus: Bradford Young Curators project.
We are counting 86 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 31 May 2024, and the latest date is 1 Nov 2025.
BD: Walls
10 Jun 2024 – 9 Aug 2025
—
i
Details of the BD: Walls project.
We are counting 19 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 273
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jun 2024, and the latest date is 9 Aug 2025.
Tour the Writer
20 Jun 2024 – 19 Jul 2025
—
—
i
Details of the Tour the Writer project.
We are counting 20 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Jun 2024, and the latest date is 19 Jul 2025.
Bradford Selection
6 Jul 2024 – 26 Jun 2025
—
i
Details of the Bradford Selection project.
We are counting 31 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Jul 2024, and the latest date is 26 Jun 2025.
Our Patch - Girafes Workshops
13 Aug – 22 Aug 2024
—
i
Details of the Our Patch - Girafes Workshops project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 374
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 13 Aug 2024, and the latest date is 22 Aug 2024.
Compagnie Off: Giraffes
20 Aug – 24 Aug 2024
—
i
Details of the Compagnie Off: Giraffes project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 52
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 20 Aug 2024, and the latest date is 24 Aug 2024.
Les Girafes
24 Aug 2024
—
i
Details of the Les Girafes project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 24 Aug 2024.
Sponsorship - Alhambra Philanthropy
4 Sep 2024
—
i
Details of the Sponsorship - Alhambra Philanthropy project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 Sep 2024.
A Portrait of Us - Outdoor Exhibition
8 Sep – 5 Oct 2024
—
i
Details of the A Portrait of Us - Outdoor Exhibition project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 8 Sep 2024, and the latest date is 5 Oct 2024.
Bradford on Foot
11 Sep 2024 – 31 Oct 2025
—
—
i
Details of the Bradford on Foot project.
We are counting 23 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 Sep 2024, and the latest date is 31 Oct 2025.
Programme Launch (Sept 12th event)
12 Sep 2024
—
—
i
Details of the Programme Launch (Sept 12th event) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 12 Sep 2024.
Beacon Feature Curtain
20 Sep – 25 Nov 2024
—
—
i
Details of the Beacon Feature Curtain project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Sep 2024, and the latest date is 25 Nov 2024.
Comma Press 'Book of the City'
20 Sep 2024 – 19 Sep 2025
—
—
i
Details of the Comma Press 'Book of the City' project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Sep 2024, and the latest date is 19 Sep 2025.
Cultural Learning Steering Group
20 Sep 2024 – 19 Sep 2025
—
—
i
Details of the Cultural Learning Steering Group project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Sep 2024, and the latest date is 19 Sep 2025.
Sing, Dance, Leap
23 Sep 2024 – 18 Jun 2025
—
i
Details of the Sing, Dance, Leap project.
We are counting 148 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 144
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 23 Sep 2024, and the latest date is 18 Jun 2025.
Wandering Imaginations: Emerging Fantasy Writer Exchange
27 Sep 2024 – 30 Nov 2025
—
i
Details of the Wandering Imaginations: Emerging Fantasy Writer Exchange project.
We are counting 20 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 27 Sep 2024, and the latest date is 30 Nov 2025.
RISE
21 Oct 2024 – 11 Jan 2025
i
Details of the RISE project.
We are counting 38 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,540
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Oct 2024, and the latest date is 11 Jan 2025.
Elevate - Heritage Skills Project
24 Oct 2024 – 11 Oct 2025
—
i
Details of the Elevate - Heritage Skills Project project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 24
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 24 Oct 2024, and the latest date is 11 Oct 2025.
Meet Our Mothers
30 Oct 2024 – 28 Sep 2025
i
Details of the Meet Our Mothers project.
We are counting 27 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,655
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Oct 2024, and the latest date is 28 Sep 2025.
PLAY: Grue
23 Nov 2024 – 23 Feb 2025
i
Details of the PLAY: Grue project.
We are counting 303 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 357
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 23 Nov 2024, and the latest date is 23 Feb 2025.
We Will Sing by Ann Hamilton at Salt's Mill
26 Nov 2024 – 2 Nov 2025
i
Details of the We Will Sing by Ann Hamilton at Salt's Mill project.
We are counting 25 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 915
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 26 Nov 2024, and the latest date is 2 Nov 2025.
Bradford Poetry Slam 2025
28 Nov 2024 – 27 Jun 2025
—
i
Details of the Bradford Poetry Slam 2025 project.
We are counting 27 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 28 Nov 2024, and the latest date is 27 Jun 2025.
Sponsorship - High Sheriff
28 Nov 2024
—
i
Details of the Sponsorship - High Sheriff project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 28 Nov 2024.
BBC Bitesize
10 Dec 2024 – 23 Jan 2025
—
—
i
Details of the BBC Bitesize project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Dec 2024, and the latest date is 23 Jan 2025.
Bradford On Foot
1 Jan – 1 Aug 2025
—
—
i
Details of the Bradford On Foot project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 1 Jan 2025, and the latest date is 1 Aug 2025.
Learning resource downloads
1 Jan – 1 Aug 2025
—
—
—
i
Details of the Learning resource downloads project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 1 Jan 2025, and the latest date is 1 Aug 2025.
Our Patch
1 Jan – 28 Aug 2025
i
Details of the Our Patch project.
We are counting 568 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 16,510
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 1 Jan 2025, and the latest date is 28 Aug 2025.
Our Patch - Barkerend Family Hub Sensory Garden and Craft Group Project
3 Jan – 23 Oct 2025
i
Details of the Our Patch - Barkerend Family Hub Sensory Garden and Craft Group Project project.
We are counting 24 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 741
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Jan 2025, and the latest date is 23 Oct 2025.
Pictureville Screenings
3 Jan – 30 Sep 2025
—
i
Details of the Pictureville Screenings project.
We are counting 1,234 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 3 Jan 2025, and the latest date is 30 Sep 2025.
Our Patch - Short Breaks
5 Jan – 8 Mar 2025
—
i
Details of the Our Patch - Short Breaks project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 66
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Jan 2025, and the latest date is 8 Mar 2025.
Our Patch - Youth Zen Den
9 Jan – 18 Sep 2025
—
i
Details of the Our Patch - Youth Zen Den project.
We are counting 24 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 313
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 9 Jan 2025, and the latest date is 18 Sep 2025.
Channels (Bodies of Water) - Turbynes
10 Jan – 15 Nov 2025
—
—
i
Details of the Channels (Bodies of Water) - Turbynes project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jan 2025, and the latest date is 15 Nov 2025.
Nationhood: Memory and Hope
10 Jan – 4 Sep 2025
—
i
Details of the Nationhood: Memory and Hope project.
We are counting 156 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 10 Jan 2025, and the latest date is 4 Sep 2025.
Our Patch - MAPA Youth Group
10 Jan – 10 Jul 2025
i
Details of the Our Patch - MAPA Youth Group project.
We are counting 15 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 238
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jan 2025, and the latest date is 10 Jul 2025.
Press Trips
10 Jan 2025
—
—
i
Details of the Press Trips project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jan 2025.
DRAW!
15 Jan – 18 May 2025
—
—
i
Details of the DRAW! project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jan 2025, and the latest date is 18 May 2025.
David Hockney: Pieced Together
15 Jan – 18 May 2025
—
i
Details of the David Hockney: Pieced Together project.
We are counting 122 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 15 Jan 2025, and the latest date is 18 May 2025.
OFMS: Asian Dub Foundation La Haine – Live @ St. Georges Hall
15 Jan 2025
—
—
i
Details of the OFMS: Asian Dub Foundation La Haine – Live @ St. Georges Hall project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 15 Jan 2025.
Our Patch - Delius School
15 Jan – 9 Oct 2025
—
i
Details of the Our Patch - Delius School project.
We are counting 25 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 265
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jan 2025, and the latest date is 9 Oct 2025.
Our Patch - Salvation Army
15 Jan – 3 Mar 2025
—
i
Details of the Our Patch - Salvation Army project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 37
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jan 2025, and the latest date is 3 Mar 2025.
Pieced Together
15 Jan – 17 May 2025
—
—
i
Details of the Pieced Together project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jan 2025, and the latest date is 17 May 2025.
Fighting To Be Heard
16 Jan – 27 Apr 2025
—
i
Details of the Fighting To Be Heard project.
We are counting 91 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 27 Apr 2025.
Our Patch - DRAW Tour Workshops: East
16 Jan – 25 Sep 2025
i
Details of the Our Patch - DRAW Tour Workshops: East project.
We are counting 19 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 910
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 25 Sep 2025.
Our Patch - DRAW Tour Workshops: Keighley & Ilkley
16 Jan – 12 Jul 2025
—
i
Details of the Our Patch - DRAW Tour Workshops: Keighley & Ilkley project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 335
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 12 Jul 2025.
Our Patch - DRAW Tour Workshops: Shipley
16 Jan – 27 Oct 2025
—
i
Details of the Our Patch - DRAW Tour Workshops: Shipley project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 712
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 27 Oct 2025.
Our Patch - DRAW Tour Workshops: South
16 Jan – 15 Oct 2025
i
Details of the Our Patch - DRAW Tour Workshops: South project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 160
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 15 Oct 2025.
Our Patch - DRAW Tour Workshops: West
16 Jan – 29 Aug 2025
—
i
Details of the Our Patch - DRAW Tour Workshops: West project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 246
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025, and the latest date is 29 Aug 2025.
Sponsorship - Business Breakfast
16 Jan 2025
—
i
Details of the Sponsorship - Business Breakfast project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jan 2025.
Bradford 2025 Mini Launch Event - Keighley
18 Jan 2025
—
—
i
Details of the Bradford 2025 Mini Launch Event - Keighley project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jan 2025.
Our Patch - One-off community events: Keighley & Ilkley
18 Jan – 9 Oct 2025
i
Details of the Our Patch - One-off community events: Keighley & Ilkley project.
We are counting 19 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,050
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jan 2025, and the latest date is 9 Oct 2025.
Our Patch - The Keighley Chorus
18 Jan – 30 Aug 2025
i
Details of the Our Patch - The Keighley Chorus project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 256
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jan 2025, and the latest date is 30 Aug 2025.
Our Patch - Lower Grange Culture Cafe
21 Jan – 14 Oct 2025
—
i
Details of the Our Patch - Lower Grange Culture Cafe project.
We are counting 30 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 713
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jan 2025, and the latest date is 14 Oct 2025.
Akram Khan and Dance United - Memories of the Future
24 Jan – 5 Jul 2025
—
i
Details of the Akram Khan and Dance United - Memories of the Future project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 24 Jan 2025, and the latest date is 5 Jul 2025.
Jungle Book ReImagined - Akram Khan Company
24 Jan – 25 Jan 2025
—
i
Details of the Jungle Book ReImagined - Akram Khan Company project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 24 Jan 2025, and the latest date is 25 Jan 2025.
Our Patch - Possibilities
27 Jan – 18 May 2025
—
i
Details of the Our Patch - Possibilities project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 302
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 27 Jan 2025, and the latest date is 18 May 2025.
Our Patch - Lower Grange Art Club
28 Jan – 28 Apr 2025
—
i
Details of the Our Patch - Lower Grange Art Club project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 99
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 28 Jan 2025, and the latest date is 28 Apr 2025.
PLAY: Intergenerational Play
29 Jan – 23 Oct 2025
i
Details of the PLAY: Intergenerational Play project.
We are counting 110 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,319
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 29 Jan 2025, and the latest date is 23 Oct 2025.
Northern Soul (Clio Barnard)
30 Jan – 14 Mar 2025
—
—
i
Details of the Northern Soul (Clio Barnard) project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 30 Jan 2025, and the latest date is 14 Mar 2025.
I AM ME
31 Jan – 4 May 2025
—
i
Details of the I AM ME project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 31 Jan 2025, and the latest date is 4 May 2025.
Our Patch - Holmewood Library Mosaic
3 Feb – 20 Jun 2025
—
i
Details of the Our Patch - Holmewood Library Mosaic project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 100
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Feb 2025, and the latest date is 20 Jun 2025.
Our Patch - Singing for Wellbeing at The Good Shepherd Centre
3 Feb – 20 Oct 2025
i
Details of the Our Patch - Singing for Wellbeing at The Good Shepherd Centre project.
We are counting 24 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 292
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Feb 2025, and the latest date is 20 Oct 2025.
Our Patch - Woodroyd Tapestry Project
4 Feb – 14 Oct 2025
i
Details of the Our Patch - Woodroyd Tapestry Project project.
We are counting 21 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 215
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 4 Feb 2025, and the latest date is 14 Oct 2025.
Sponsorship - Yorkshire Water
5 Feb 2025
—
i
Details of the Sponsorship - Yorkshire Water project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Feb 2025.
The Big Creative Summit - Investment in West Yorkshire
5 Feb 2025
—
—
i
Details of the The Big Creative Summit - Investment in West Yorkshire project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Feb 2025.
Our Patch - Northcliffe Environmental Enterprises Team (NEET)
10 Feb – 10 Sep 2025
—
i
Details of the Our Patch - Northcliffe Environmental Enterprises Team (NEET) project.
We are counting 27 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 197
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Feb 2025, and the latest date is 10 Sep 2025.
Our Patch - Laisterdyke Women's Tapestry and Craft Group
11 Feb – 5 May 2025
—
i
Details of the Our Patch - Laisterdyke Women's Tapestry and Craft Group project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 17
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Feb 2025, and the latest date is 5 May 2025.
Our Patch - The Travelling Spoon
11 Feb – 14 Aug 2025
i
Details of the Our Patch - The Travelling Spoon project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 106
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Feb 2025, and the latest date is 14 Aug 2025.
Our Patch - Parkside Tapestry Project
12 Feb – 29 Oct 2025
i
Details of the Our Patch - Parkside Tapestry Project project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 328
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Feb 2025, and the latest date is 29 Oct 2025.
PLAY: The Great Adventure Build with Woodland Tribe
13 Feb – 17 Aug 2025
—
i
Details of the PLAY: The Great Adventure Build with Woodland Tribe project.
We are counting 58 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,783
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 13 Feb 2025, and the latest date is 17 Aug 2025.
Our Patch - Public Art Trail Holmewood
14 Feb – 15 Apr 2025
—
i
Details of the Our Patch - Public Art Trail Holmewood project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 72
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 14 Feb 2025, and the latest date is 15 Apr 2025.
Ramadan Festival
15 Feb – 22 Mar 2025
—
i
Details of the Ramadan Festival project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Feb 2025, and the latest date is 22 Mar 2025.
Ramadan Pavillion
16 Feb – 12 Apr 2025
—
—
i
Details of the Ramadan Pavillion project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 16 Feb 2025, and the latest date is 12 Apr 2025.
Common/Wealth: Public Interest
19 Feb – 31 May 2025
—
i
Details of the Common/Wealth: Public Interest project.
We are counting 18 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 19 Feb 2025, and the latest date is 31 May 2025.
Community Takeover Days at Bradford City Football Club
22 Feb – 2 May 2025
—
—
i
Details of the Community Takeover Days at Bradford City Football Club project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 Feb 2025, and the latest date is 2 May 2025.
Our Patch - Thornbury Roundabout Environmental Art Project
25 Feb – 6 May 2025
—
i
Details of the Our Patch - Thornbury Roundabout Environmental Art Project project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 104
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 25 Feb 2025, and the latest date is 6 May 2025.
Our Patch - Unique Voices
26 Feb – 8 Apr 2025
—
i
Details of the Our Patch - Unique Voices project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 115
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Feb 2025, and the latest date is 8 Apr 2025.
PLAY: Playable Commission
26 Feb – 16 Aug 2025
—
i
Details of the PLAY: Playable Commission project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 9
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Feb 2025, and the latest date is 16 Aug 2025.
BBC Introducing at The Underground
28 Feb – 29 Aug 2025
—
—
i
Details of the BBC Introducing at The Underground project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 28 Feb 2025, and the latest date is 29 Aug 2025.
Bassline Symphony
28 Feb – 14 Jun 2025
i
Details of the Bassline Symphony project.
We are counting 51 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 225
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 28 Feb 2025, and the latest date is 14 Jun 2025.
Bradford 2025 Volunteer Celebration
28 Feb 2025
—
—
i
Details of the Bradford 2025 Volunteer Celebration project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 28 Feb 2025.
Our Patch - Denholme Youth Group
10 Mar – 8 Sep 2025
—
i
Details of the Our Patch - Denholme Youth Group project.
We are counting 18 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 172
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Mar 2025, and the latest date is 8 Sep 2025.
Our Patch - The Gateway Centre Weaving Project
10 Mar – 20 Oct 2025
i
Details of the Our Patch - The Gateway Centre Weaving Project project.
We are counting 25 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 194
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Mar 2025, and the latest date is 20 Oct 2025.
BBC Extraordinary Portraits
11 Mar – 6 Apr 2025
i
Details of the BBC Extraordinary Portraits project.
We are counting 20 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,400
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 11 Mar 2025, and the latest date is 6 Apr 2025.
Our Patch - Bierley Community Centre Art Club
11 Mar – 23 Jul 2025
—
i
Details of the Our Patch - Bierley Community Centre Art Club project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 77
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Mar 2025, and the latest date is 23 Jul 2025.
Bradford 2025 Partners and Funders Networking Event
12 Mar 2025
—
—
i
Details of the Bradford 2025 Partners and Funders Networking Event project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 12 Mar 2025.
Our Patch - Get2Gether Group
12 Mar – 16 Oct 2025
i
Details of the Our Patch - Get2Gether Group project.
We are counting 19 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 338
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Mar 2025, and the latest date is 16 Oct 2025.
Our Patch - St Hugh's Craft Group
12 Mar – 26 Mar 2025
—
i
Details of the Our Patch - St Hugh's Craft Group project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 34
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Mar 2025, and the latest date is 26 Mar 2025.
Sponsorship - Loading Bay Funder
12 Mar 2025
—
i
Details of the Sponsorship - Loading Bay Funder project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 12 Mar 2025.
The Dreams I Had: Andrea Dunbar
12 Mar 2025
—
i
Details of the The Dreams I Had: Andrea Dunbar project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 12 Mar 2025.
Our Patch - MAPA Girls Group
13 Mar – 9 Oct 2025
i
Details of the Our Patch - MAPA Girls Group project.
We are counting 30 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 929
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 13 Mar 2025, and the latest date is 9 Oct 2025.
Our Patch - Windhill Seniors Group
13 Mar – 2 Oct 2025
—
i
Details of the Our Patch - Windhill Seniors Group project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 165
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 13 Mar 2025, and the latest date is 2 Oct 2025.
Loaded Laughs (#1)
14 Mar 2025
—
i
Details of the Loaded Laughs (#1) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Mar 2025.
Our Patch - BSL and Art/Hands that Speak / Open Hands
14 Mar – 14 Oct 2025
—
i
Details of the Our Patch - BSL and Art/Hands that Speak / Open Hands project.
We are counting 21 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 423
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 14 Mar 2025, and the latest date is 14 Oct 2025.
The Portrait of Mai: Youth Engagement Programme
14 Mar – 16 Aug 2025
—
i
Details of the The Portrait of Mai: Youth Engagement Programme project.
We are counting 18 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 34
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 14 Mar 2025, and the latest date is 16 Aug 2025.
Ginger Johnson's Fun House
15 Mar 2025
—
i
Details of the Ginger Johnson's Fun House project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Mar 2025.
Lady Bushra (supporting Ginger)
15 Mar 2025
—
—
i
Details of the Lady Bushra (supporting Ginger) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Mar 2025.
Spread the Word About Bradford 2025
15 Mar – 16 Mar 2025
—
—
i
Details of the Spread the Word About Bradford 2025 project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Mar 2025, and the latest date is 16 Mar 2025.
Lady Maisery / O'Hooley & Tidow
16 Mar 2025
—
i
Details of the Lady Maisery / O'Hooley & Tidow project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 16 Mar 2025.
Our Patch - One-off community events: East
16 Mar – 2 Aug 2025
i
Details of the Our Patch - One-off community events: East project.
We are counting 15 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,987
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Mar 2025, and the latest date is 2 Aug 2025.
Wild Uplands
18 Mar – 11 Oct 2025
i
Details of the Wild Uplands project.
We are counting 900 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 6,524
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 18 Mar 2025, and the latest date is 11 Oct 2025.
Our Patch - Denholme Juniors Youth Group
19 Mar – 15 Apr 2025
—
i
Details of the Our Patch - Denholme Juniors Youth Group project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 41
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Mar 2025, and the latest date is 15 Apr 2025.
Our Patch - Bagsy the Backseat
20 Mar – 5 Jun 2025
—
i
Details of the Our Patch - Bagsy the Backseat project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 230
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 20 Mar 2025, and the latest date is 5 Jun 2025.
Dracula
21 Mar – 23 Mar 2025
—
i
Details of the Dracula project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 21 Mar 2025, and the latest date is 23 Mar 2025.
Dragons - Eun-Me Ahn Company
21 Mar – 22 Mar 2025
—
—
i
Details of the Dragons - Eun-Me Ahn Company project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 21 Mar 2025, and the latest date is 22 Mar 2025.
Dragons
22 Mar 2025
—
—
i
Details of the Dragons project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 Mar 2025.
Share Your Story at Beacon (National Literacy Trust)
22 Mar – 13 Sep 2025
—
i
Details of the Share Your Story at Beacon (National Literacy Trust) project.
We are counting 16 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,435
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Mar 2025, and the latest date is 13 Sep 2025.
The Railway Children
22 Mar – 4 Oct 2025
i
Details of the The Railway Children project.
We are counting 91 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 12,870
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Mar 2025, and the latest date is 4 Oct 2025.
BBC: Not Even Water Live (Podcast Recording)
25 Mar 2025
—
—
i
Details of the BBC: Not Even Water Live (Podcast Recording) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Mar 2025.
PLAY: Escape Room Design Challenge
25 Mar – 27 Mar 2025
—
—
i
Details of the PLAY: Escape Room Design Challenge project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Mar 2025, and the latest date is 27 Mar 2025.
Unspun Stories
26 Mar – 30 Mar 2025
—
i
Details of the Unspun Stories project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 26 Mar 2025, and the latest date is 30 Mar 2025.
Our Patch - Pop up repair patch
27 Mar – 28 May 2025
—
i
Details of the Our Patch - Pop up repair patch project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 61
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 27 Mar 2025, and the latest date is 28 May 2025.
Sponsorship - Northern Trains
27 Mar 2025
—
i
Details of the Sponsorship - Northern Trains project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 27 Mar 2025.
National Saturday Club
29 Mar – 12 Jul 2025
—
i
Details of the National Saturday Club project.
We are counting 32 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 112
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 29 Mar 2025, and the latest date is 12 Jul 2025.
World Piano Day 2025
29 Mar 2025
—
—
i
Details of the World Piano Day 2025 project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 29 Mar 2025.
A Screen Near You - The Incredible Moving Cinema
30 Mar – 15 Jun 2025
i
Details of the A Screen Near You - The Incredible Moving Cinema project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 32
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Film evaluation category.
The earliest date is 30 Mar 2025, and the latest date is 15 Jun 2025.
ARCHIVE: How Soon Is Now (grant dependent)
31 Mar – 1 Apr 2025
—
—
i
Details of the ARCHIVE: How Soon Is Now (grant dependent) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 31 Mar 2025, and the latest date is 1 Apr 2025.
Do your thing micro awards
31 Mar 2025
—
—
i
Details of the Do your thing micro awards project.
We are counting 53 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Community-led arts event evaluation category.
The earliest date is 31 Mar 2025.
Bradford's Bigger Picture - Pictureville Year Round Programme
1 Apr – 19 Jul 2025
—
—
i
Details of the Bradford's Bigger Picture - Pictureville Year Round Programme project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 1 Apr 2025, and the latest date is 19 Jul 2025.
Our Patch - Crazy Zebra Crew
1 Apr – 6 May 2025
—
i
Details of the Our Patch - Crazy Zebra Crew project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 50
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 1 Apr 2025, and the latest date is 6 May 2025.
Beacon
2 Apr – 27 Aug 2025
—
—
i
Details of the Beacon project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 2 Apr 2025, and the latest date is 27 Aug 2025.
Bloom
2 Apr – 27 Sep 2025
—
i
Details of the Bloom project.
We are counting 68 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,463
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Apr 2025, and the latest date is 27 Sep 2025.
Our Patch - Marie Curie Residents Project
2 Apr – 1 Oct 2025
i
Details of the Our Patch - Marie Curie Residents Project project.
We are counting 20 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 132
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Apr 2025, and the latest date is 1 Oct 2025.
YOU:MATTER
2 Apr – 30 Nov 2025
—
i
Details of the YOU:MATTER project.
We are counting 187 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 2 Apr 2025, and the latest date is 30 Nov 2025.
Our Patch - Dementia Friendly Keighley The Singing Teapot!
3 Apr – 3 Oct 2025
—
i
Details of the Our Patch - Dementia Friendly Keighley The Singing Teapot! project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 100
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Apr 2025, and the latest date is 3 Oct 2025.
Tech Styles @ The Beacon
3 Apr 2025
i
Details of the Tech Styles @ The Beacon project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 39
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Apr 2025.
asses.masses
3 Apr – 5 Apr 2025
—
i
Details of the asses.masses project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 3 Apr 2025, and the latest date is 5 Apr 2025.
A Screen Near You - Cinema for All (grassroots development and screening)
4 Apr – 31 Jul 2025
—
—
i
Details of the A Screen Near You - Cinema for All (grassroots development and screening) project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 4 Apr 2025, and the latest date is 31 Jul 2025.
International Roma Day Celebration
4 Apr 2025
—
i
Details of the International Roma Day Celebration project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 Apr 2025.
Eliza Carthy
5 Apr 2025
—
i
Details of the Eliza Carthy project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Apr 2025.
Let's Make
5 Apr – 21 Sep 2025
—
i
Details of the Let's Make project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,509
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Apr 2025, and the latest date is 21 Sep 2025.
PLAY Facilitators @ Beacon (all)
5 Apr – 27 Sep 2025
—
i
Details of the PLAY Facilitators @ Beacon (all) project.
We are counting 16 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,039
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Apr 2025, and the latest date is 27 Sep 2025.
Claytime
6 Apr 2025
—
i
Details of the Claytime project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Apr 2025.
Our Patch - Street Sounds 9 at Bolton Community Church
6 Apr – 27 Apr 2025
—
i
Details of the Our Patch - Street Sounds 9 at Bolton Community Church project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 42
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Apr 2025, and the latest date is 27 Apr 2025.
Palettes
7 Apr – 9 Apr 2025
—
i
Details of the Palettes project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 7 Apr 2025, and the latest date is 9 Apr 2025.
Our Patch - Salvation Army Express Yourself!
8 Apr – 18 Jun 2025
—
i
Details of the Our Patch - Salvation Army Express Yourself! project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 183
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Apr 2025, and the latest date is 18 Jun 2025.
University of Bradford Programme
8 Apr – 22 Jun 2025
—
i
Details of the University of Bradford Programme project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Apr 2025, and the latest date is 22 Jun 2025.
Toxic
9 Apr 2025
—
i
Details of the Toxic project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 9 Apr 2025.
Our Patch - One-off community events: South
10 Apr – 24 Oct 2025
i
Details of the Our Patch - One-off community events: South project.
We are counting 23 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,414
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Apr 2025, and the latest date is 24 Oct 2025.
Roshni
10 Apr 2025
—
i
Details of the Roshni project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Apr 2025.
Big Brass Blowout
11 Apr – 13 Apr 2025
i
Details of the Big Brass Blowout project.
We are counting 22 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 68
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Festival evaluation category.
The earliest date is 11 Apr 2025, and the latest date is 13 Apr 2025.
Our Patch - One-off community events: Shipley
11 Apr – 26 Oct 2025
i
Details of the Our Patch - One-off community events: Shipley project.
We are counting 25 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,596
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Apr 2025, and the latest date is 26 Oct 2025.
Saltaire Heritage Day
11 Apr 2025
—
—
i
Details of the Saltaire Heritage Day project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 Apr 2025.
The Big Beacon Family Welcome - Wibsey
11 Apr 2025
i
Details of the The Big Beacon Family Welcome - Wibsey project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,232
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Apr 2025.
Loud and Proud Dohl Drumming
12 Apr – 19 Jul 2025
i
Details of the Loud and Proud Dohl Drumming project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 534
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Apr 2025, and the latest date is 19 Jul 2025.
Curious Investigators
13 Apr 2025
—
i
Details of the Curious Investigators project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 13 Apr 2025.
Our Patch - Carnival Dance Project
13 Apr – 1 Jul 2025
—
i
Details of the Our Patch - Carnival Dance Project project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 215
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 13 Apr 2025, and the latest date is 1 Jul 2025.
Bradford South Young Peoples Celebration (Youth Service)
14 Apr 2025
—
i
Details of the Bradford South Young Peoples Celebration (Youth Service) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 70
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 14 Apr 2025.
CBeebies Bedtime Story Day
15 Apr – 16 Apr 2025
—
i
Details of the CBeebies Bedtime Story Day project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Apr 2025, and the latest date is 16 Apr 2025.
Our Patch - Shipley Resource Centre
15 Apr – 17 Jun 2025
—
i
Details of the Our Patch - Shipley Resource Centre project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 41
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Apr 2025, and the latest date is 17 Jun 2025.
Big Screen - Cannon Mills
17 Apr – 19 Apr 2025
—
i
Details of the Big Screen - Cannon Mills project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 17 Apr 2025, and the latest date is 19 Apr 2025.
Bradford: A City of Film
17 Apr – 31 Oct 2025
—
—
i
Details of the Bradford: A City of Film project.
We are counting 12 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 17 Apr 2025, and the latest date is 31 Oct 2025.
Frontline 1984-1985 by Victor Wedderburn
17 Apr – 29 Oct 2025
i
Details of the Frontline 1984-1985 by Victor Wedderburn project.
We are counting 172 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 2,267
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 17 Apr 2025, and the latest date is 29 Oct 2025.
It's Your Round
17 Apr 2025
—
i
Details of the It's Your Round project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 17 Apr 2025.
An Evening with: Jacqui Dankworth
19 Apr 2025
—
i
Details of the An Evening with: Jacqui Dankworth project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 19 Apr 2025.
FRESH 2025 - Workshops and Matinee Stage Performance
19 Apr 2025
i
Details of the FRESH 2025 - Workshops and Matinee Stage Performance project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 216
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Apr 2025.
Pop
19 Apr 2025
—
i
Details of the Pop project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 19 Apr 2025.
Say It As It Is (Wibsey)
19 Apr – 22 Apr 2025
i
Details of the Say It As It Is (Wibsey) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 15
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Apr 2025, and the latest date is 22 Apr 2025.
Easter Fun and Celebration
20 Apr 2025
—
i
Details of the Easter Fun and Celebration project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 421
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 20 Apr 2025.
Teen Scene Party
20 Apr – 19 Jul 2025
—
i
Details of the Teen Scene Party project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Apr 2025, and the latest date is 19 Jul 2025.
Our Patch - Lower Grange Choir Grief Support
21 Apr – 30 Sep 2025
i
Details of the Our Patch - Lower Grange Choir Grief Support project.
We are counting 26 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 393
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Apr 2025, and the latest date is 30 Sep 2025.
Beacon Church Community Cuppa
22 Apr 2025
—
i
Details of the Beacon Church Community Cuppa project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 76
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Apr 2025.
Our Patch - ACT OUT!
22 Apr – 7 Oct 2025
—
i
Details of the Our Patch - ACT OUT! project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 182
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Apr 2025, and the latest date is 7 Oct 2025.
Our Patch - Urdu Shurdu
22 Apr – 27 May 2025
—
i
Details of the Our Patch - Urdu Shurdu project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 20
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Apr 2025, and the latest date is 27 May 2025.
Our Patch - Creative Flare Clayton
23 Apr – 24 Jul 2025
—
i
Details of the Our Patch - Creative Flare Clayton project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 75
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 23 Apr 2025, and the latest date is 24 Jul 2025.
WOW Community Partnership
23 Apr 2025
—
i
Details of the WOW Community Partnership project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 23 Apr 2025.
Little Wimmin
24 Apr – 25 Apr 2025
—
i
Details of the Little Wimmin project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 24 Apr 2025, and the latest date is 25 Apr 2025.
BBC Introducing @ The Beacon
25 Apr 2025
i
Details of the BBC Introducing @ The Beacon project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 9
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 25 Apr 2025.
Tower of Now: Saad Qureshi (programme strand)
25 Apr – 26 Apr 2025
—
—
i
Details of the Tower of Now: Saad Qureshi (programme strand) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Apr 2025, and the latest date is 26 Apr 2025.
Tower of Now Engagement Strand
26 Apr 2025
—
i
Details of the Tower of Now Engagement Strand project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 40
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Apr 2025.
West Yorkshire Young Poet Laureate
26 Apr 2025
i
Details of the West Yorkshire Young Poet Laureate project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 17
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Apr 2025.
Youthology
26 Apr 2025
—
i
Details of the Youthology project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 26 Apr 2025.
The Sticky Dance
27 Apr 2025
—
i
Details of the The Sticky Dance project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 27 Apr 2025.
Lay Down Your Burdens
28 Apr – 30 Apr 2025
i
Details of the Lay Down Your Burdens project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 3
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 28 Apr 2025, and the latest date is 30 Apr 2025.
Our Patch - Dhol Drumming
29 Apr – 6 Aug 2025
i
Details of the Our Patch - Dhol Drumming project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 119
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 29 Apr 2025, and the latest date is 6 Aug 2025.
Our Patch - K Town Sound Machine
30 Apr – 1 Oct 2025
i
Details of the Our Patch - K Town Sound Machine project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 322
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Apr 2025, and the latest date is 1 Oct 2025.
zz - Loading Bay Venue Activity (non-project related)
30 Apr – 22 Sep 2025
—
i
Details of the zz - Loading Bay Venue Activity (non-project related) project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 30 Apr 2025, and the latest date is 22 Sep 2025.
Our Patch - Bingley 25 Festival
2 May – 30 May 2025
—
i
Details of the Our Patch - Bingley 25 Festival project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,498
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 May 2025, and the latest date is 30 May 2025.
Qawalli Night at The Beacon
2 May 2025
—
i
Details of the Qawalli Night at The Beacon project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 2 May 2025.
Bantam of the Opera
4 May 2025
—
i
Details of the Bantam of the Opera project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 May 2025.
Les Enfants Terribles - A Gameshow for Awful Children
4 May 2025
—
i
Details of the Les Enfants Terribles - A Gameshow for Awful Children project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 May 2025.
Peace Picnics (all parks)
4 May – 7 Sep 2025
—
i
Details of the Peace Picnics (all parks) project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 146
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 4 May 2025, and the latest date is 7 Sep 2025.
Sponsorship - Super Soapbox Challenge
4 May 2025
—
i
Details of the Sponsorship - Super Soapbox Challenge project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 May 2025.
Whine List
4 May 2025
—
i
Details of the Whine List project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 May 2025.
Bradford Belles
5 May 2025
—
i
Details of the Bradford Belles project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 May 2025.
Creative Cities Convention
6 May – 7 May 2025
—
i
Details of the Creative Cities Convention project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 May 2025, and the latest date is 7 May 2025.
So Far, So Good (Yorkshire Dance, as part of BD FEST)
6 May – 26 Jul 2025
—
i
Details of the So Far, So Good (Yorkshire Dance, as part of BD FEST) project.
We are counting 35 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 432
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 May 2025, and the latest date is 26 Jul 2025.
The 56
10 May – 11 May 2025
—
i
Details of the The 56 project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 May 2025, and the latest date is 11 May 2025.
Bradford City Fire 40th Anniversary Memorial
11 May 2025
—
—
i
Details of the Bradford City Fire 40th Anniversary Memorial project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 May 2025.
Keighley Cougars Match Day Event
11 May 2025
—
—
i
Details of the Keighley Cougars Match Day Event project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 May 2025.
Our Patch - Youth Music at Bolton Community Church
11 May – 18 May 2025
—
i
Details of the Our Patch - Youth Music at Bolton Community Church project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 28
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 May 2025, and the latest date is 18 May 2025.
A Good Yarn: Luke Jerram
12 May – 27 Nov 2025
i
Details of the A Good Yarn: Luke Jerram project.
We are counting 40 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,934
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 May 2025, and the latest date is 27 Nov 2025.
Our Patch - The Wellbeing Walkers
12 May – 2 Jul 2025
—
i
Details of the Our Patch - The Wellbeing Walkers project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 47
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 May 2025, and the latest date is 2 Jul 2025.
Our Patch - Ravenscliffe Drumming Workshops
18 May – 29 Jul 2025
—
i
Details of the Our Patch - Ravenscliffe Drumming Workshops project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 182
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 May 2025, and the latest date is 29 Jul 2025.
Celebrations of Bradford 2025 and LNER Partnership
19 May 2025
—
i
Details of the Celebrations of Bradford 2025 and LNER Partnership project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 19 May 2025.
Our Patch - Cadets (Keighley/Shipley)
19 May – 3 Jun 2025
—
i
Details of the Our Patch - Cadets (Keighley/Shipley) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 22
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 May 2025, and the latest date is 3 Jun 2025.
Our Patch - Highfield Centre Chit and Chatter Wellbeing Group
19 May – 8 Jul 2025
i
Details of the Our Patch - Highfield Centre Chit and Chatter Wellbeing Group project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 74
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 May 2025, and the latest date is 8 Jul 2025.
OFMS: Nadine Shah @ St. Georges Hall
20 May 2025
—
i
Details of the OFMS: Nadine Shah @ St. Georges Hall project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 May 2025.
zz - Beacon - Non-project related venue activity
21 May – 12 Jul 2025
—
—
i
Details of the zz - Beacon - Non-project related venue activity project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 21 May 2025, and the latest date is 12 Jul 2025.
An Evening with Resi/Dance @ The Beacon (Dance United)
22 May 2025
—
i
Details of the An Evening with Resi/Dance @ The Beacon (Dance United) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 May 2025.
Jameel Prize: Moving Images
22 May – 17 Aug 2025
—
—
i
Details of the Jameel Prize: Moving Images project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 May 2025, and the latest date is 17 Aug 2025.
Journeys with Mai (exhibition)
22 May – 16 Aug 2025
—
—
i
Details of the Journeys with Mai (exhibition) project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 May 2025, and the latest date is 16 Aug 2025.
Tape Letters
22 May – 15 Jun 2025
—
i
Details of the Tape Letters project.
We are counting 17 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 22 May 2025, and the latest date is 15 Jun 2025.
Aswad Arts Presents StreetSounds "LIVE" Bhangra Niche Set "LIVE"
23 May 2025
—
i
Details of the Aswad Arts Presents StreetSounds "LIVE" Bhangra Niche Set "LIVE" project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 23 May 2025.
Earth & Sky (part of Wild Uplands)
23 May – 22 Oct 2025
—
—
i
Details of the Earth & Sky (part of Wild Uplands) project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 23 May 2025, and the latest date is 22 Oct 2025.
Journeys with Mai
23 May – 17 Aug 2025
—
i
Details of the Journeys with Mai project.
We are counting 76 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 23 May 2025, and the latest date is 17 Aug 2025.
Our Patch - Community Trips - Bradford West
23 May – 10 Oct 2025
i
Details of the Our Patch - Community Trips - Bradford West project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 122
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 23 May 2025, and the latest date is 10 Oct 2025.
Immersive Arts UK Conference - The Big Thing
25 May – 11 Jun 2025
—
—
i
Details of the Immersive Arts UK Conference - The Big Thing project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 25 May 2025, and the latest date is 11 Jun 2025.
Intro to Comedy Workshop Series with Alex Dunlop
25 May – 13 Jul 2025
—
i
Details of the Intro to Comedy Workshop Series with Alex Dunlop project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 May 2025, and the latest date is 13 Jul 2025.
PLAY: Red Ball Project (WOW)
25 May – 31 May 2025
—
i
Details of the PLAY: Red Ball Project (WOW) project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 May 2025, and the latest date is 31 May 2025.
Robyn Hood
25 May 2025
—
i
Details of the Robyn Hood project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 May 2025.
Dancing with Colours
27 May 2025
—
i
Details of the Dancing with Colours project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 27 May 2025.
Happy Hype
27 May – 28 May 2025
—
i
Details of the Happy Hype project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 27 May 2025, and the latest date is 28 May 2025.
Our Patch - Community Trips - Shipley
27 May – 9 Oct 2025
i
Details of the Our Patch - Community Trips - Shipley project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 47
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 27 May 2025, and the latest date is 9 Oct 2025.
Sisters 360
29 May – 31 May 2025
—
i
Details of the Sisters 360 project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 29 May 2025, and the latest date is 31 May 2025.
Zee and the City
29 May – 26 Jul 2025
i
Details of the Zee and the City project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 760
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 29 May 2025, and the latest date is 26 Jul 2025.
Pictureville Screenings - Northern Youth Film Season
30 May – 13 Jun 2025
—
—
i
Details of the Pictureville Screenings - Northern Youth Film Season project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 30 May 2025, and the latest date is 13 Jun 2025.
Spin Arts: RIDE
30 May – 21 Sep 2025
i
Details of the Spin Arts: RIDE project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 366
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 May 2025, and the latest date is 21 Sep 2025.
Basel Zaraa - Moomins
31 May – 22 Jun 2025
—
i
Details of the Basel Zaraa - Moomins project.
We are counting 30 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 31 May 2025, and the latest date is 22 Jun 2025.
Bradford Producing Hub
31 May – 30 Sep 2025
—
—
i
Details of the Bradford Producing Hub project.
We are counting 421 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Training and skills development evaluation category.
The earliest date is 31 May 2025, and the latest date is 30 Sep 2025.
Creative Health
31 May 2025
—
—
i
Details of the Creative Health project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Training and skills development evaluation category.
The earliest date is 31 May 2025.
Our Patch - Bingley Skate Park/Myrtle Park
31 May – 19 Sep 2025
i
Details of the Our Patch - Bingley Skate Park/Myrtle Park project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 166
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 31 May 2025, and the latest date is 19 Sep 2025.
CHANNELS
1 Jun – 30 Sep 2025
—
—
i
Details of the CHANNELS project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 1 Jun 2025, and the latest date is 30 Sep 2025.
DRAW & Messy Play
2 Jun – 3 Jun 2025
—
i
Details of the DRAW & Messy Play project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 113
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Jun 2025, and the latest date is 3 Jun 2025.
Our Patch - Doorstep Davincis
2 Jun – 30 Sep 2025
—
i
Details of the Our Patch - Doorstep Davincis project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 88
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Jun 2025, and the latest date is 30 Sep 2025.
Our Patch - The Blank Page Club
2 Jun – 29 Jul 2025
i
Details of the Our Patch - The Blank Page Club project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 96
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Jun 2025, and the latest date is 29 Jul 2025.
Our Patch - Baildon Carnival - Banner Making
4 Jun – 30 Jun 2025
—
i
Details of the Our Patch - Baildon Carnival - Banner Making project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 63
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 4 Jun 2025, and the latest date is 30 Jun 2025.
Our Patch - Crafty Folk Windhill
4 Jun – 9 Oct 2025
—
i
Details of the Our Patch - Crafty Folk Windhill project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 19
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 4 Jun 2025, and the latest date is 9 Oct 2025.
Greed
5 Jun – 6 Jun 2025
—
i
Details of the Greed project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Jun 2025, and the latest date is 6 Jun 2025.
Our Patch - Eastwood Singing Sessions (Peace meal)
5 Jun – 19 Jun 2025
—
i
Details of the Our Patch - Eastwood Singing Sessions (Peace meal) project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 110
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Jun 2025, and the latest date is 19 Jun 2025.
New Music Biennial
6 Jun – 8 Aug 2025
i
Details of the New Music Biennial project.
We are counting 27 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 105
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Festival evaluation category.
The earliest date is 6 Jun 2025, and the latest date is 8 Aug 2025.
Sponsorship - YABA
6 Jun 2025
—
i
Details of the Sponsorship - YABA project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Jun 2025.
Club Ekta (multiple events)
7 Jun – 15 Jun 2025
—
i
Details of the Club Ekta (multiple events) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 45
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 7 Jun 2025, and the latest date is 15 Jun 2025.
The Tiger Lillies
7 Jun 2025
—
i
Details of the The Tiger Lillies project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 7 Jun 2025.
Bradford Literature Festival - New Commissions
8 Jun – 29 Jun 2025
—
—
i
Details of the Bradford Literature Festival - New Commissions project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 8 Jun 2025, and the latest date is 29 Jun 2025.
Multicultural Pentecost Party
8 Jun 2025
—
i
Details of the Multicultural Pentecost Party project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jun 2025.
Punjabi Heritage and Culture by Saath
8 Jun 2025
—
i
Details of the Punjabi Heritage and Culture by Saath project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jun 2025.
Wonky Olympics
8 Jun – 27 Jul 2025
i
Details of the Wonky Olympics project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 88
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jun 2025, and the latest date is 27 Jul 2025.
My Project Does Not Appear
10 Jun – 14 Oct 2025
i
Details of the My Project Does Not Appear project.
We are counting 14 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 268
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jun 2025, and the latest date is 14 Oct 2025.
Sustenance the Power of Food
10 Jun 2025
—
i
Details of the Sustenance the Power of Food project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jun 2025.
The Big Thing - Immersive Arts
10 Jun – 11 Jun 2025
—
i
Details of the The Big Thing - Immersive Arts project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jun 2025, and the latest date is 11 Jun 2025.
Our Patch - One-off community events: West
11 Jun – 9 Sep 2025
i
Details of the Our Patch - One-off community events: West project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 278
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Jun 2025, and the latest date is 9 Sep 2025.
Our Patch - Scouts and Cubs at St James Church Hall
11 Jun – 23 Oct 2025
—
i
Details of the Our Patch - Scouts and Cubs at St James Church Hall project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 381
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Jun 2025, and the latest date is 23 Oct 2025.
PLAY: Science Explorers Play Lab
11 Jun – 15 Sep 2025
—
—
i
Details of the PLAY: Science Explorers Play Lab project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 Jun 2025, and the latest date is 15 Sep 2025.
Testo
11 Jun – 12 Jun 2025
—
i
Details of the Testo project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 Jun 2025, and the latest date is 12 Jun 2025.
Tu i Tam / Tyt i Tam: Tim Smith & Lodz Fotofestival
11 Jun – 27 Jul 2025
i
Details of the Tu i Tam / Tyt i Tam: Tim Smith & Lodz Fotofestival project.
We are counting 22 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 430
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 11 Jun 2025, and the latest date is 27 Jul 2025.
Built By Sound (formerly Daytimers)
12 Jun – 13 Jun 2025
—
i
Details of the Built By Sound (formerly Daytimers) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 16
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Jun 2025, and the latest date is 13 Jun 2025.
Our Patch - Arabic Calligraphy
12 Jun – 18 Oct 2025
i
Details of the Our Patch - Arabic Calligraphy project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 46
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Jun 2025, and the latest date is 18 Oct 2025.
Loaded Laughs (#2)
13 Jun 2025
—
i
Details of the Loaded Laughs (#2) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 13 Jun 2025.
Street Choirs Festival
13 Jun – 14 Jun 2025
—
i
Details of the Street Choirs Festival project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 13 Jun 2025, and the latest date is 14 Jun 2025.
At The 1 in 12
14 Jun – 15 Jun 2025
—
i
Details of the At The 1 in 12 project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jun 2025, and the latest date is 15 Jun 2025.
Big Quiffy Bingo
14 Jun 2025
—
i
Details of the Big Quiffy Bingo project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jun 2025.
Digital Creatives
14 Jun – 7 Sep 2025
—
i
Details of the Digital Creatives project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jun 2025, and the latest date is 7 Sep 2025.
Pop Up Family Pride
14 Jun 2025
—
i
Details of the Pop Up Family Pride project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 100
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jun 2025.
Our Patch - Boxing for wellbeing Al Hira Mosque
15 Jun – 26 Oct 2025
i
Details of the Our Patch - Boxing for wellbeing Al Hira Mosque project.
We are counting 25 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 524
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jun 2025, and the latest date is 26 Oct 2025.
Our Patch - Musical Stories
15 Jun – 29 Oct 2025
i
Details of the Our Patch - Musical Stories project.
We are counting 15 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 539
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jun 2025, and the latest date is 29 Oct 2025.
Cricket Tournament Awards Ceremony
16 Jun 2025
—
i
Details of the Cricket Tournament Awards Ceremony project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 60
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jun 2025.
Forge - Practical Anarchy
16 Jun 2025
—
—
i
Details of the Forge - Practical Anarchy project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 16 Jun 2025.
Bradford Sanctuary Seekers Education Awards 2025
17 Jun 2025
—
i
Details of the Bradford Sanctuary Seekers Education Awards 2025 project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 115
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jun 2025.
Language No Broblem: Shubbak Festival
17 Jun 2025
—
i
Details of the Language No Broblem: Shubbak Festival project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jun 2025.
Our Patch - Reevy Hill Mural
17 Jun – 14 Oct 2025
i
Details of the Our Patch - Reevy Hill Mural project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 128
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jun 2025, and the latest date is 14 Oct 2025.
Pictureville Screenings - Cine Spotlights
17 Jun – 24 Jul 2025
—
—
i
Details of the Pictureville Screenings - Cine Spotlights project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 17 Jun 2025, and the latest date is 24 Jul 2025.
Youth Club in Bowling Park
17 Jun 2025
—
i
Details of the Youth Club in Bowling Park project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 120
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jun 2025.
Ice Age Art Now
18 Jun – 25 Sep 2025
—
i
Details of the Ice Age Art Now project.
We are counting 102 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 18 Jun 2025, and the latest date is 25 Sep 2025.
Museums for Play and Growth
18 Jun 2025
—
i
Details of the Museums for Play and Growth project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 66
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jun 2025.
Our Patch - Green Futures: The New Keith Thompson Centre
18 Jun – 20 Sep 2025
i
Details of the Our Patch - Green Futures: The New Keith Thompson Centre project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 545
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jun 2025, and the latest date is 20 Sep 2025.
Say It As It Is (Bowling)
18 Jun 2025
i
Details of the Say It As It Is (Bowling) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 12
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Jun 2025.
Pictureville Screenings - Time and Place (Invisible Women)
19 Jun – 25 Jun 2025
—
—
i
Details of the Pictureville Screenings - Time and Place (Invisible Women) project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 19 Jun 2025, and the latest date is 25 Jun 2025.
The Belgrave House Band - Back to Black
19 Jun 2025
—
i
Details of the The Belgrave House Band - Back to Black project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 19 Jun 2025.
Eggs Collective Dark Nights
20 Jun – 5 Sep 2025
—
i
Details of the Eggs Collective Dark Nights project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Jun 2025, and the latest date is 5 Sep 2025.
Penguin
20 Jun – 21 Jun 2025
—
i
Details of the Penguin project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 20 Jun 2025, and the latest date is 21 Jun 2025.
Here We Stand
21 Jun – 31 Aug 2025
i
Details of the Here We Stand project.
We are counting 20 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 19
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 21 Jun 2025, and the latest date is 31 Aug 2025.
Our Patch - Denholme Mural Project
21 Jun – 20 Aug 2025
—
i
Details of the Our Patch - Denholme Mural Project project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 119
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jun 2025, and the latest date is 20 Aug 2025.
Sarab
21 Jun 2025
—
—
i
Details of the Sarab project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jun 2025.
Connecting Communities
22 Jun 2025
—
i
Details of the Connecting Communities project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 392
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jun 2025.
Our Patch - Boxing for wellbeing Kirkgate Centre
22 Jun – 14 Aug 2025
i
Details of the Our Patch - Boxing for wellbeing Kirkgate Centre project.
We are counting 10 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 114
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jun 2025, and the latest date is 14 Aug 2025.
Forge - Scraps
23 Jun 2025
—
—
i
Details of the Forge - Scraps project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 23 Jun 2025.
Our Patch - Motiv8 - What you sayin
24 Jun – 16 Jul 2025
—
i
Details of the Our Patch - Motiv8 - What you sayin project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 59
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 24 Jun 2025, and the latest date is 16 Jul 2025.
PLAY: Alive & Kicking Drama Adventures
24 Jun – 23 Oct 2025
—
—
i
Details of the PLAY: Alive & Kicking Drama Adventures project.
We are counting 32 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 24 Jun 2025, and the latest date is 23 Oct 2025.
Launchpad Music Industry Careers Day
25 Jun 2025
—
—
i
Details of the Launchpad Music Industry Careers Day project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Jun 2025.
Opera North Earth and Sky
25 Jun – 28 Sep 2025
—
i
Details of the Opera North Earth and Sky project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 25 Jun 2025, and the latest date is 28 Sep 2025.
Our Patch - Sangat Centre - Keighley Central - Mens Over 50s
25 Jun – 17 Jul 2025
i
Details of the Our Patch - Sangat Centre - Keighley Central - Mens Over 50s project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 59
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 25 Jun 2025, and the latest date is 17 Jul 2025.
Our Patch - Boxing for wellbeing Carlton Bolling School
26 Jun – 31 Jul 2025
i
Details of the Our Patch - Boxing for wellbeing Carlton Bolling School project.
We are counting 9 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 169
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Jun 2025, and the latest date is 31 Jul 2025.
Pictureville Screenings - Film4 Curated Season
26 Jun – 16 Aug 2025
—
—
i
Details of the Pictureville Screenings - Film4 Curated Season project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 26 Jun 2025, and the latest date is 16 Aug 2025.
Back In The Pink - Castles In The Sky
28 Jun – 11 Oct 2025
i
Details of the Back In The Pink - Castles In The Sky project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 7
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 28 Jun 2025, and the latest date is 11 Oct 2025.
Bradford Literature Festival @ Loading Bay
28 Jun – 1 Jul 2025
—
i
Details of the Bradford Literature Festival @ Loading Bay project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 28 Jun 2025, and the latest date is 1 Jul 2025.
DRAW
30 Jun 2025
—
—
i
Details of the DRAW project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 718
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Digital evaluation category.
The earliest date is 30 Jun 2025.
Learning resources
30 Jun 2025
—
—
—
i
Details of the Learning resources project.
We are counting 0 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Digital evaluation category.
The earliest date is 30 Jun 2025.
Pictureville Screenings - 'Brought to Life' Season
30 Jun – 31 Jul 2025
—
—
i
Details of the Pictureville Screenings - 'Brought to Life' Season project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 30 Jun 2025, and the latest date is 31 Jul 2025.
STRIKE
30 Jun – 9 Oct 2025
—
i
Details of the STRIKE project.
We are counting 43 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 484
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Jun 2025, and the latest date is 9 Oct 2025.
Our Patch - Hainworth Wood Older People’s Lunch
1 Jul – 15 Jul 2025
—
i
Details of the Our Patch - Hainworth Wood Older People’s Lunch project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 46
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 1 Jul 2025, and the latest date is 15 Jul 2025.
Our Patch - Boxing for wellbeing Oneness Centre
2 Jul – 20 Aug 2025
i
Details of the Our Patch - Boxing for wellbeing Oneness Centre project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 113
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Jul 2025, and the latest date is 20 Aug 2025.
Memories of the Future
5 Jul 2025
—
i
Details of the Memories of the Future project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Jul 2025.
Our Patch - People's Care Movement
5 Jul – 8 Aug 2025
—
i
Details of the Our Patch - People's Care Movement project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 40
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Jul 2025, and the latest date is 8 Aug 2025.
Cultural Learning One-Off Activity
8 Jul 2025
—
—
i
Details of the Cultural Learning One-Off Activity project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jul 2025.
My Thousand Year Old Land
8 Jul 2025
—
i
Details of the My Thousand Year Old Land project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jul 2025.
Our Patch - Bangladeshi Community Association (BCA)
8 Jul – 29 Jul 2025
—
i
Details of the Our Patch - Bangladeshi Community Association (BCA) project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 34
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Jul 2025, and the latest date is 29 Jul 2025.
Our Patch - Rhythms on The Road East
9 Jul 2025
i
Details of the Our Patch - Rhythms on The Road East project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 32
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 9 Jul 2025.
Our Patch - Tu i Tam Community Visits
9 Jul – 20 Jul 2025
i
Details of the Our Patch - Tu i Tam Community Visits project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 119
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 9 Jul 2025, and the latest date is 20 Jul 2025.
Imaginary Friends - Daniel Bye
10 Jul 2025
—
i
Details of the Imaginary Friends - Daniel Bye project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Jul 2025.
Drag-ford: Drag Cabaret Built in Bradford
11 Jul 2025
i
Details of the Drag-ford: Drag Cabaret Built in Bradford project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 18
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Jul 2025.
Chasing the Wind
12 Jul – 13 Jul 2025
—
i
Details of the Chasing the Wind project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 12 Jul 2025, and the latest date is 13 Jul 2025.
Our Patch - Buttershaw Sandale Trust 'Youth Art'
14 Jul – 19 Aug 2025
—
i
Details of the Our Patch - Buttershaw Sandale Trust 'Youth Art' project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 47
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jul 2025, and the latest date is 19 Aug 2025.
People First Keighley and Craven Summer Party
14 Jul 2025
—
i
Details of the People First Keighley and Craven Summer Party project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Jul 2025.
Our Patch - Our Holmewood Mural
15 Jul – 24 Sep 2025
—
i
Details of the Our Patch - Our Holmewood Mural project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 87
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jul 2025, and the latest date is 24 Sep 2025.
Our Patch - Wild + Kind
15 Jul – 7 Oct 2025
—
i
Details of the Our Patch - Wild + Kind project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 258
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 15 Jul 2025, and the latest date is 7 Oct 2025.
Health and Wellbeing Day
16 Jul 2025
—
i
Details of the Health and Wellbeing Day project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 190
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Jul 2025.
Come Rest in Chaos
17 Jul 2025
—
i
Details of the Come Rest in Chaos project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jul 2025.
Film Culture in Bradford and Keighley: Friends of Bradford Art Galleries and Museums
17 Jul 2025
—
i
Details of the Film Culture in Bradford and Keighley: Friends of Bradford Art Galleries and Museums project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jul 2025.
Our Patch - Art Bike Project
17 Jul – 31 Jul 2025
—
i
Details of the Our Patch - Art Bike Project project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 19
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jul 2025, and the latest date is 31 Jul 2025.
Our Patch - The Bridge - Cultural Care Package
17 Jul – 30 Jul 2025
—
i
Details of the Our Patch - The Bridge - Cultural Care Package project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 25
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jul 2025, and the latest date is 30 Jul 2025.
Say It As It Is - Cliffe Castle
17 Jul 2025
i
Details of the Say It As It Is - Cliffe Castle project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 10
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Jul 2025.
All Ages Singing Workshop (Beacon)
20 Jul 2025
—
i
Details of the All Ages Singing Workshop (Beacon) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 45
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 20 Jul 2025.
Great Crafty Get-Together
21 Jul 2025
—
i
Details of the Great Crafty Get-Together project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 86
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jul 2025.
Our Patch - Beacon Rugby Tots
21 Jul – 22 Jul 2025
—
i
Details of the Our Patch - Beacon Rugby Tots project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 148
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jul 2025, and the latest date is 22 Jul 2025.
Our Patch - Summer Reading Challenge (All Areas)
21 Jul – 6 Aug 2025
i
Details of the Our Patch - Summer Reading Challenge (All Areas) project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 306
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 21 Jul 2025, and the latest date is 6 Aug 2025.
Last Rites
22 Jul 2025
—
i
Details of the Last Rites project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jul 2025.
Our Patch - St Wilfrids Church - Church Star Project
22 Jul – 19 Oct 2025
i
Details of the Our Patch - St Wilfrids Church - Church Star Project project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 59
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jul 2025, and the latest date is 19 Oct 2025.
Our Patch - Vibe Check
22 Jul – 26 Aug 2025
—
i
Details of the Our Patch - Vibe Check project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 20
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jul 2025, and the latest date is 26 Aug 2025.
Your Best Guess
22 Jul – 23 Jul 2025
i
Details of the Your Best Guess project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 28
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Jul 2025, and the latest date is 23 Jul 2025.
Our Patch - Birdbox Project
23 Jul – 13 Sep 2025
i
Details of the Our Patch - Birdbox Project project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 255
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 23 Jul 2025, and the latest date is 13 Sep 2025.
Our Patch - KAWACC
23 Jul – 29 Sep 2025
i
Details of the Our Patch - KAWACC project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 55
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 23 Jul 2025, and the latest date is 29 Sep 2025.
Leeds School of Architecture x Bradford 2025 - The City As a Festival
24 Jul – 27 Jul 2025
—
i
Details of the Leeds School of Architecture x Bradford 2025 - The City As a Festival project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 24 Jul 2025, and the latest date is 27 Jul 2025.
Babysphere & Colorsphere
25 Jul – 26 Jul 2025
—
i
Details of the Babysphere & Colorsphere project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Jul 2025, and the latest date is 26 Jul 2025.
Evening Conversations - Sudha Bhuchar residency Theatre in the Mill
25 Jul – 28 Oct 2025
—
i
Details of the Evening Conversations - Sudha Bhuchar residency Theatre in the Mill project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Jul 2025, and the latest date is 28 Oct 2025.
World of Women (Cecil Green Arts)
25 Jul 2025
—
i
Details of the World of Women (Cecil Green Arts) project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Jul 2025.
A Good Yarn
27 Jul – 30 Sep 2025
—
i
Details of the A Good Yarn project.
We are counting 57 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 27 Jul 2025, and the latest date is 30 Sep 2025.
Cool Runnings
27 Jul 2025
—
i
Details of the Cool Runnings project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 27 Jul 2025.
Our Patch - St Wilfrid's Community Cafe - Storytelling project
29 Jul – 23 Oct 2025
i
Details of the Our Patch - St Wilfrid's Community Cafe - Storytelling project project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 107
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 29 Jul 2025, and the latest date is 23 Oct 2025.
Festival of Archaeology: Archaeology Talks!
30 Jul 2025
—
i
Details of the Festival of Archaeology: Archaeology Talks! project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 30 Jul 2025.
Little Explorers [Festival of Archaeology]
30 Jul 2025
—
i
Details of the Little Explorers [Festival of Archaeology] project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 220
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Jul 2025.
Palingenesis
30 Jul 2025
—
i
Details of the Palingenesis project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 30 Jul 2025.
Highfield South Asian Celebration
31 Jul 2025
—
—
i
Details of the Highfield South Asian Celebration project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 31 Jul 2025.
Our Patch - Hainworth Wood: East meets West Cooking
31 Jul 2025
—
i
Details of the Our Patch - Hainworth Wood: East meets West Cooking project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 18
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 31 Jul 2025.
Pictureville Screenings - Epic Yorkshire Season
31 Jul – 31 Aug 2025
—
—
i
Details of the Pictureville Screenings - Epic Yorkshire Season project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 31 Jul 2025, and the latest date is 31 Aug 2025.
Summer Sounds - Day 1
2 Aug 2025
—
i
Details of the Summer Sounds - Day 1 project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 2 Aug 2025.
Penguin Books 16+ Panel
3 Aug 2025
—
i
Details of the Penguin Books 16+ Panel project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 3 Aug 2025.
Summer Sounds - Day 2
3 Aug 2025
—
i
Details of the Summer Sounds - Day 2 project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 3 Aug 2025.
Digital Map
5 Aug – 30 Nov 2025
—
—
i
Details of the Digital Map project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Aug 2025, and the latest date is 30 Nov 2025.
Green Family Creative Day
5 Aug 2025
—
i
Details of the Green Family Creative Day project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 100
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Aug 2025.
Our Patch - Beacon Creative family sessions
5 Aug – 8 Aug 2025
—
i
Details of the Our Patch - Beacon Creative family sessions project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 219
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 5 Aug 2025, and the latest date is 8 Aug 2025.
Summer of Song with Steeton Male Voice Choir
5 Aug 2025
—
i
Details of the Summer of Song with Steeton Male Voice Choir project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 5 Aug 2025.
Creative Summer Social (Cultural Voice Forum)
6 Aug 2025
i
Details of the Creative Summer Social (Cultural Voice Forum) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 441
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Aug 2025.
Mega Drawing Box in the Park
6 Aug 2025
—
i
Details of the Mega Drawing Box in the Park project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 441
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Aug 2025.
Our Patch - Community Trips - Bradford South
6 Aug – 12 Oct 2025
i
Details of the Our Patch - Community Trips - Bradford South project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 132
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Aug 2025, and the latest date is 12 Oct 2025.
Our Patch - Roots & Fruits
6 Aug – 22 Oct 2025
i
Details of the Our Patch - Roots & Fruits project.
We are counting 12 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 431
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Aug 2025, and the latest date is 22 Oct 2025.
PLAY: Island of Foam (WOW)
6 Aug 2025
—
i
Details of the PLAY: Island of Foam (WOW) project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Aug 2025.
Re:Born
7 Aug – 22 Aug 2025
i
Details of the Re:Born project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 9
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 7 Aug 2025, and the latest date is 22 Aug 2025.
Youth Fest 25
7 Aug 2025
—
i
Details of the Youth Fest 25 project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 7 Aug 2025.
Our Story (Nebula Girls Group)
8 Aug 2025
—
i
Details of the Our Story (Nebula Girls Group) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Aug 2025.
Cliffe Castle Park 75th Birthday Bash
9 Aug 2025
—
i
Details of the Cliffe Castle Park 75th Birthday Bash project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 9 Aug 2025.
Endless Hum
9 Aug 2025
—
i
Details of the Endless Hum project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 9 Aug 2025.
Bradford South Asian Festival : Shadmanny
10 Aug – 12 Oct 2025
—
i
Details of the Bradford South Asian Festival : Shadmanny project.
We are counting 24 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 447
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 10 Aug 2025, and the latest date is 12 Oct 2025.
Bradford StoryHub Drop In
10 Aug – 2 Sep 2025
—
—
i
Details of the Bradford StoryHub Drop In project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Aug 2025, and the latest date is 2 Sep 2025.
CANCELLED Stick in the Wheel
10 Aug 2025
—
—
i
Details of the CANCELLED Stick in the Wheel project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Aug 2025.
Bradford Made MASTER
11 Aug – 17 Oct 2025
—
—
i
Details of the Bradford Made MASTER project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 11 Aug 2025, and the latest date is 17 Oct 2025.
Our Patch - Holme in the Wood coffee shop and Bierley Church - BD4 Artistes
12 Aug – 29 Oct 2025
—
i
Details of the Our Patch - Holme in the Wood coffee shop and Bierley Church - BD4 Artistes project.
We are counting 13 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 109
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Aug 2025, and the latest date is 29 Oct 2025.
BOLD! Bradford Artist Scratch Night
14 Aug 2025
—
i
Details of the BOLD! Bradford Artist Scratch Night project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 14 Aug 2025.
Loaded Laughs (#3)
15 Aug 2025
—
i
Details of the Loaded Laughs (#3) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 15 Aug 2025.
Our Patch - Tong Village - The Village Van Goghs
16 Aug – 6 Oct 2025
—
i
Details of the Our Patch - Tong Village - The Village Van Goghs project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 87
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Aug 2025, and the latest date is 6 Oct 2025.
Our Patch - Community Trips - Bradford East
17 Aug – 31 Oct 2025
—
i
Details of the Our Patch - Community Trips - Bradford East project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 121
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 17 Aug 2025, and the latest date is 31 Oct 2025.
Our Patch - Brackenhill Park Picasso Parks
18 Aug – 7 Oct 2025
—
i
Details of the Our Patch - Brackenhill Park Picasso Parks project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 30
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 18 Aug 2025, and the latest date is 7 Oct 2025.
Ark
19 Aug – 4 Sep 2025
i
Details of the Ark project.
We are counting 22 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 62
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Aug 2025, and the latest date is 4 Sep 2025.
Big Screen - Ilkley Lido
22 Aug – 23 Aug 2025
—
i
Details of the Big Screen - Ilkley Lido project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 22 Aug 2025, and the latest date is 23 Aug 2025.
Our Patch - Community Trips - Keighley & Ilkley
22 Aug – 18 Oct 2025
—
i
Details of the Our Patch - Community Trips - Keighley & Ilkley project.
We are counting 16 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 215
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Aug 2025, and the latest date is 18 Oct 2025.
Turner Prize
22 Aug – 30 Nov 2025
i
Details of the Turner Prize project.
We are counting 96 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 200
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 22 Aug 2025, and the latest date is 30 Nov 2025.
Our Patch - The Pebble Project
26 Aug – 29 Aug 2025
—
i
Details of the Our Patch - The Pebble Project project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 239
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 26 Aug 2025, and the latest date is 29 Aug 2025.
Tent of Hope
29 Aug 2025
—
i
Details of the Tent of Hope project.
We are counting 11 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 29 Aug 2025.
Alam Lohar workshop
30 Aug 2025
—
—
i
Details of the Alam Lohar workshop project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 30 Aug 2025.
Cocoa Butter Club
30 Aug 2025
—
i
Details of the Cocoa Butter Club project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 30 Aug 2025.
Little Foodies
30 Aug 2025
—
i
Details of the Little Foodies project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 948
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 30 Aug 2025.
Whale, Where Are You Going?
31 Aug 2025
—
i
Details of the Whale, Where Are You Going? project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 31 Aug 2025.
Hindu Sangh Culture Event
2 Sep 2025
—
i
Details of the Hindu Sangh Culture Event project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 2 Sep 2025.
Hot Caribbean Beatz in the Park
2 Sep 2025
—
i
Details of the Hot Caribbean Beatz in the Park project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 2 Sep 2025.
Our Patch - Street Dance (Bolton Woods Centre/Black History Month)
2 Sep – 23 Sep 2025
—
i
Details of the Our Patch - Street Dance (Bolton Woods Centre/Black History Month) project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 33
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 2 Sep 2025, and the latest date is 23 Sep 2025.
Art & Play Family Day
3 Sep 2025
—
i
Details of the Art & Play Family Day project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 117
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Sep 2025.
Our Patch - Masjid Ayesha
3 Sep – 22 Oct 2025
i
Details of the Our Patch - Masjid Ayesha project.
We are counting 6 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 140
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 3 Sep 2025, and the latest date is 22 Oct 2025.
A Somali Village in Lister Park: Friends of Bradford Art Galleries and Museums
4 Sep 2025
—
i
Details of the A Somali Village in Lister Park: Friends of Bradford Art Galleries and Museums project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 Sep 2025.
Fair Play Symposium
4 Sep 2025
—
—
i
Details of the Fair Play Symposium project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 4 Sep 2025.
Our Patch - Wibsey Community Garden - BD6 Artistes
4 Sep – 18 Sep 2025
—
i
Details of the Our Patch - Wibsey Community Garden - BD6 Artistes project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 7
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 4 Sep 2025, and the latest date is 18 Sep 2025.
Blankets & Wine Festival Bradford
6 Sep 2025
—
i
Details of the Blankets & Wine Festival Bradford project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Sep 2025.
Camille O'Sullivan
6 Sep 2025
—
i
Details of the Camille O'Sullivan project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 6 Sep 2025.
Life Class (509 Arts)
6 Sep – 12 Oct 2025
i
Details of the Life Class (509 Arts) project.
We are counting 18 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 35
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Sep 2025, and the latest date is 12 Oct 2025.
Khooghi
7 Sep 2025
—
i
Details of the Khooghi project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 7 Sep 2025.
PLAY: REPLAY
7 Sep – 1 Nov 2025
i
Details of the PLAY: REPLAY project.
We are counting 69 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 208
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 7 Sep 2025, and the latest date is 1 Nov 2025.
Our Patch - In Other Words
8 Sep – 27 Oct 2025
—
i
Details of the Our Patch - In Other Words project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 36
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Sep 2025, and the latest date is 27 Oct 2025.
Share and Care (Bradford New Church, Frizinghall)
8 Sep 2025
—
—
i
Details of the Share and Care (Bradford New Church, Frizinghall) project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 8 Sep 2025.
Baton of Hope
9 Sep 2025
—
i
Details of the Baton of Hope project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 9 Sep 2025.
Sip and Paint with Creative Flare
9 Sep 2025
—
i
Details of the Sip and Paint with Creative Flare project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 44
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 9 Sep 2025.
Gaana Shaana - Open Mic
10 Sep 2025
—
i
Details of the Gaana Shaana - Open Mic project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 10 Sep 2025.
On Yer Bike
10 Sep – 14 Sep 2025
—
i
Details of the On Yer Bike project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 364
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the Exhibition evaluation category.
The earliest date is 10 Sep 2025, and the latest date is 14 Sep 2025.
Kailey
11 Sep – 13 Sep 2025
i
Details of the Kailey project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 38
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 11 Sep 2025, and the latest date is 13 Sep 2025.
Qigong and Tai Chi Mid Autumn Moon Festival
12 Sep 2025
—
i
Details of the Qigong and Tai Chi Mid Autumn Moon Festival project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 123
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 12 Sep 2025.
Big Screen - Thornton Viaduct
13 Sep 2025
—
i
Details of the Big Screen - Thornton Viaduct project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 13 Sep 2025.
The Invite by Mind the Gap
16 Sep – 20 Sep 2025
i
Details of the The Invite by Mind the Gap project.
We are counting 7 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 15
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 16 Sep 2025, and the latest date is 20 Sep 2025.
Our Turn: Visual Arts Festival
17 Sep – 25 Oct 2025
—
i
Details of the Our Turn: Visual Arts Festival project.
We are counting 24 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 17 Sep 2025, and the latest date is 25 Oct 2025.
Contains Strong Language - BBC
18 Sep – 21 Sep 2025
—
i
Details of the Contains Strong Language - BBC project.
We are counting 45 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Festival evaluation category.
The earliest date is 18 Sep 2025, and the latest date is 21 Sep 2025.
Our Patch - Our Story, Our City
19 Sep – 30 Oct 2025
i
Details of the Our Patch - Our Story, Our City project.
We are counting 8 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 49
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Sep 2025, and the latest date is 30 Oct 2025.
Poetry Takeaway
19 Sep – 21 Sep 2025
i
Details of the Poetry Takeaway project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 212
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 19 Sep 2025, and the latest date is 21 Sep 2025.
Big Bradford WESTival Celebration of Culture and Community
21 Sep 2025
—
i
Details of the Big Bradford WESTival Celebration of Culture and Community project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 21 Sep 2025.
Our Patch - Roshni Ghar Wellbeing Group
22 Sep – 29 Sep 2025
—
i
Details of the Our Patch - Roshni Ghar Wellbeing Group project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 39
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 22 Sep 2025, and the latest date is 29 Sep 2025.
Our Patch - Us Girls
24 Sep – 22 Oct 2025
—
i
Details of the Our Patch - Us Girls project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 29
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 24 Sep 2025, and the latest date is 22 Oct 2025.
Pictureville Screenings - Widescreen Weekend
24 Sep – 29 Sep 2025
—
—
i
Details of the Pictureville Screenings - Widescreen Weekend project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Film evaluation category.
The earliest date is 24 Sep 2025, and the latest date is 29 Sep 2025.
Our Patch - Holmewood Film Project
25 Sep – 23 Oct 2025
i
Details of the Our Patch - Holmewood Film Project project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 46
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 25 Sep 2025, and the latest date is 23 Oct 2025.
World Curry Festival
25 Sep – 26 Sep 2025
—
i
Details of the World Curry Festival project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 25 Sep 2025, and the latest date is 26 Sep 2025.
Beacon DRAW!
27 Sep 2025
—
i
Details of the Beacon DRAW! project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 1,558
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 27 Sep 2025.
Elmet
27 Sep – 1 Nov 2025
i
Details of the Elmet project.
We are counting 27 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 33
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 27 Sep 2025, and the latest date is 1 Nov 2025.
Nisbet Road Tailor's Shop
30 Sep – 29 Nov 2025
—
i
Details of the Nisbet Road Tailor's Shop project.
We are counting 5 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the Exhibition evaluation category.
The earliest date is 30 Sep 2025, and the latest date is 29 Nov 2025.
Our Patch - Bolton Villas Youth Group
6 Oct – 27 Oct 2025
—
i
Details of the Our Patch - Bolton Villas Youth Group project.
We are counting 4 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 33
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 6 Oct 2025, and the latest date is 27 Oct 2025.
OFMS: John Grant @ St Georges Hall
7 Oct 2025
i
Details of the OFMS: John Grant @ St Georges Hall project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 636
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 7 Oct 2025.
Our Patch - Between the Lines
8 Oct – 22 Oct 2025
—
i
Details of the Our Patch - Between the Lines project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 15
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Oct 2025, and the latest date is 22 Oct 2025.
Our Patch - Heart and Hands Studio
8 Oct – 22 Oct 2025
—
i
Details of the Our Patch - Heart and Hands Studio project.
We are counting 3 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 88
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 8 Oct 2025, and the latest date is 22 Oct 2025.
Soundwave - Finale Showcase
18 Oct 2025
—
—
i
Details of the Soundwave - Finale Showcase project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 18 Oct 2025.
Charlie Mackesy Schools Talk
22 Oct 2025
—
—
i
Details of the Charlie Mackesy Schools Talk project.
We are counting 1 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
This project is being counted in the In-person evaluation category.
The earliest date is 22 Oct 2025.
Our Patch - DeMaskUs
25 Oct 2025
—
i
Details of the Our Patch - DeMaskUs project.
We are counting 2 events overall.
This is derived from adding the
0 events records in the Project Hub schedule table
to 0 events collected from other sources
(such as third-party organisations or Bradford 2025 activity not yet tracked in the Project Hub).
NB The participants total of 25
does not currently show a count of individuals for all sources. At present some are better termed participant instances -
one person who attended three events would be counted three times. Efforts are being made to count unique individuals where this is possible.
This project is being counted in the In-person evaluation category.
The earliest date is 25 Oct 2025.