What effect Bradford 2025 has on the district from 2026 to 2030 (and beyond).
Note that individual projects will contribute only in a small way to some of the longer-term impacts.
Some key outcome and impact indicators will be collected longer term by our evaluation partners.
This includes:
- Some of the outcome indicators collected via our Economic and Social Value Impact Assessment.
- District-wide impacts of the 10-year Culture is our Plan (CIOP) Strategy (of which Bradford 2025 designation was one ambition) are being monitored by BMDC.
This does not include activity and output measures.